Beverley Uranium Mine – Trunkline Extension Project

From 2023 to 2024 DM Plastics & Steel delivered a major pipeline supply contract for Heathgate Resources’ Beverley Uranium Mine near Wooltana, South Australia. DMP&S supplied and managed delivery of 17 km of DN500 Metric White Co‑Ex (Lo‑Heat) poly pipe in SDR17 PN10 and SDR13.6 PN12.5, manufactured in 20 m straight lengths, together with 2 […]
Mod-Cod – Ambrosia Mine

DM Plastics & Steel were awarded the major supply and delivery contract for the Mod‑Cod project at Iluka Resources’ Jacinth‑Ambrosia mineral sands operation in Yellabinna. Scope comprised 11 km of DN450, DN500 and DN560 Metric Co‑Ex (Lo‑Heat) polyethylene pipe in SDR13.6 PN12.5, supplied in 20 m straight lengths and delivered over 26 extendable trailers. DMP&S […]
Evaporation Ponds 7 (Olympic Dam)

DM Plastics & Steel were awarded the major supply contract for the Evaporation Ponds project at BHP’s Olympic Dam operation. The scope comprised the supply and delivery of 20 km of DN315 and DN400 Metric White Co‑Ex (Lo‑Heat) SDR13.6 PN12.5 polyethylene pipe plus a suite of project‑specific sweep bends manufactured to a range of radii […]
Honeymoon Mine Trunkline Extension Project

From 2025 to 2026 DM Plastics & Steel delivered the trunkline extension for Boss Energy’s Honeymoon uranium operation near Kalkaroo, South Australia. DMP&S supplied and managed delivery of 4 km of DN630 Metric White Co‑Ex (Lo‑Heat) SDR11 PN16 polyethylene pipe in 20 m straight lengths, selected to maximise installation efficiency and minimise onsite joins. All […]