From 2023 to 2024 DM Plastics & Steel delivered a major pipeline supply contract for Heathgate Resources’ Beverley Uranium Mine near Wooltana, South Australia. DMP&S supplied and managed delivery of 17 km of DN500 Metric White Co‑Ex (Lo‑Heat) poly pipe in SDR17 PN10 and SDR13.6 PN12.5, manufactured in 20 m straight lengths, together with 2 km of DN710 Metric All Black SDR17 PN10 in 20 m lengths.
Beverley operation is an in‑situ recovery (ISR) uranium mine in the Frome Basin / Wooltana region of South Australia. Beverley is recognised as one of Australia’s largest ISR uranium mines and is a significant ISR operation globally, supporting ongoing uranium extraction and processing for both domestic and export markets.
All logistics were coordinated and executed by DMP&S, with staged site deliveries of over 42 extendable trailers. Our scope included full transport and delivery management, Journey Management Plans, site compliance and staged deliveries to align with remote‑site operational requirements, ensuring materials were available to match installation sequencing. The project materials were delivered on time, in full (OTIF), ensuring uninterrupted installation sequencing and operational continuity.